【 | Case Study】
Switching from a conventional bandwidth controller to PureFlow WS1. What used to take about a month to change settings after a problem occurred can now be handled in 30 minutes, resulting in significant labor and time savings.
2022/06/10 12:06 pm
- Category
- System
- Tags
- WANInternetWorkload reductionLabor-saving
- Related URL
- https://www.anritsu.com/ja-JP/network-solutions/case-studies/bandwidth-control#:~:text=%E5%9F%BC%E7%8E%89%E6%A0%AA%E5%BC%8F%E4%BC%9A%E7%A4%BE%E6%A7%98%EF%BC%88-,%E3%82%B3%E3%83%BC%E3%83%97%E3%83%87%E3%83%AA%E7%94%9F%E6%B4%BB%E5%8D%94%E5%90%8C%E7%B5%84%E5%90%88%E9%80%A3%E5%90%88%E4%BC%9A,-%E6%A7%98%EF%BC%89
Service provider : | ANRITSU CORPORATION |
---|---|
Service user : | CO-OPDELI CONSUMERS’ CO-OPERATIVE UNION |
*Check a case study at the related URL on the bottom of this page if the case study is not shown.